PENINSULA HOT SPRINGS

Client: Peninsula Hot Springs

Delivery: Fixed Lump Sum

Project Duration: 4 Months

Project Location: Fingal

Working within a live environment and directly adjacent to operating bathing pools, the project provided an architecturally designed shade structure and enclosure to the existing café and amphitheatre. In collaboration with Terroir, the project required careful resourcing and planning to ensure construction could occur with minimal noise disruption and with consistent crossover between construction and visitors of the facility.

Previous
Previous

OXLEY KIDS

Next
Next

SORRENTO ANTHENAEUM