
PENINSULA HOT SPRINGS
Client: Peninsula Hot Springs
Delivery: Fixed Lump Sum
Project Duration: 4 Months
Project Location: Fingal
Working within a live environment and directly adjacent to operating bathing pools, the project provided an architecturally designed shade structure and enclosure to the existing café and amphitheatre. In collaboration with Terroir, the project required careful resourcing and planning to ensure construction could occur with minimal noise disruption and with consistent crossover between construction and visitors of the facility.

























